Preventive measure of structural strengthening

Preventive measure of structural strengthening: CFRP strengthening, steel plate strengthening, post installed anchoring.


Preventive measure of structural strengthening


Item

Common problems

Preventive measure
Post installed anchor

The glue is not full enough; the distance between the steel bar and the hole wall is uneven

Glue injecting gun is used to post installed anchor, and two times correction is made after steel bar is implanted. The length of exposed steel bar is reasonably reserved, and the difficulty of planting bar is reduced.
Externally bonded CFRP wrapThe bond is not firm; carbon fiber cloth is not soaked; hollowing, etc.

Strengthen the grinding of the base and brush the primer glue.

The carbon fiber cloth is soaked with carbon fiber adhesive glue and then paste.

Roll along the same direction, carbon fiber selvage suitable for more glue.

Pate steel plate

Hollowing

The steel plate and the concrete surface are evenly coated with steel plate adhesive.

Strictly control the thickness of the steel plate glue.

Pressure perfusion glue is used for construction.


Horse Construction Önerilen Ürünler

Burada ihtiyacınız olan her şeyi bulabilirsiniz. Bu ürünleri denemeye güvenin, sonra büyük bir fark göreceksiniz.

HM-20 Karbon Elyaf Kumaş

Horse Construction'ın karbon fiberi, binalar, köprüler, otoyollar, demiryolları, tüneller, iskeleler ve sivil havaalanlarındaki beton, duvarcılık, çelik ve ahşap alt tabakaların yapısal güçlendirilmesi, onarımı ve yenilenmesi içindir.

Daha Fazla >

HM-120 Epoksi Bağlayıcı Çelik Levha

HM-120 yapısal çelik levha bağlayıcı yapıştırıcı, güçlü yapışma özelliğine sahip, oda sıcaklığında kürlenen iki bileşenli epoksi bir üründür. Çelik ve betonun kendi kendine yapışmasında ve karşılıklı yapışmasında mükemmel yaşlanma karşıtı, şok direnci özel

Daha Fazla >

Back
Top
Close